Dome installation complete.

# Domes

schedule 2017-08-10
Matthew Lehner

We officially completed the installation of the domes early this evening. We leveled each dome (or rather, we checked and found that they were installed level when we placed each dome on the top of the enclosures), installed some rubber sealing around the bases, greased up the dome tracks,  got all of the control boxes and cables hooked up, and tested that everything still worked. No photos today, all of the exciting stuff was during the past couple days, and there is nothing really new to see.

I now plan to wrap up the remaining work on my list so I can get out of here for a little bit. Tomorrow morning I will install the last dome azimuth encoder (I did two of them today) and all three dome home switches. Then I will get to work on finishing the installation of the lights. and I will work on completing the dome control box panels. I hope to have all of this done by Saturday, or Monday at the latest.