  • Construction of Telescope Enclosures


    2016/06/13. Beginning of the site preparation at site #2. Dummy columns to be installed for assembly of dome ring beam, test floor beam layout,  and to determine shimming requirements to bring columns to same height. 2016/06/13. Measureing height of dummy column at site #2 with water level to determine correct shimming. 2016/07/01: Floor structure under assembly to test layout at site #2. 2016/07/31. Ring beam for dome base assembled atop dummy columns at site #2. 2016/09/01. Lifting assembled ring beam over pier to stow during construction at site #2. 2016/09/01. Lifting assembled ring beam over pier to stow during construction at site #2. 2016/09/01. Lifting assembled ring beam over pier to stow during construction at site #2. 2016/09/14. Lifting dome ring beam into place at site #2. 2016/09/14. Securing dome ring beam onto top of main building columns at site #2. 2016/10/02. Erecting main building structure at site #3. 2016/10/02. Erecting main building structure at site #3. 2016/10/02. Beginning work on observing room floor at site #2. 2016/10/02. Erecting main building structure at site #3. 2016/10/03. Installation of observing room floor joist at site #3. 2016/10/03. Installation of observing room floor at site #2.2016/10/17. Installation of building skins at site #2. 2016/10/17. Installation of building skins at site #2. 2016/10/18. Installation of building skins at site #2. 2016/10/21. Installation of building skins at site #2. 2016/12/14. View of observing floor from inside enclosure at site #2. 2016/12/14. Inside wall of enclosure at site #2. 2016/12/14. Top of pier inside observing room at site #2. 2016/12/14. Enclosure at site #3. Temporary roof is installed to protect observing room floor form the elements during the winter. 2016/12/14. Rubén Lopez (Lorus Construction), Mauricio Reyes Ruiz (UNAM), and Matthew Lehner (ASIAA) atop the pier in enclosure at site #2. 2016/12/14. Top of stairway outside observing room at site #2. 2016/12/14. Matthew Lehner at top of stairway to observing room at site #2. 2017/03/14. Finishing steel structure erection at site 1. 2017/03/16. Lifting ring beam to top off steel structure at site 1. 2017/03/16. Ring beam in place at site 1. Steel skeleton of enclosure now complete. 2017/04/24. Installation of sunshade girt. 2017/04/24. Installation of sunshade girt. 2017/04/24. Installation of sunshade girt. 2017/04/24. Installation of sunshade girt. 2017/04/29. Construction of electronics room inside telescope enclosure. 2017/04/29. Construction of electronics room inside telescope enclosure. 2017/04/29. Construction of electronics room inside telescope enclosure. 2017/04/29. Construction of electronics room inside telescope enclosure. 2017/04/29. Construction of electronics room inside telescope enclosure. 2017/04/30. Construction of dome assembly platform at site 2. 2017/04/30. Construction of dome assembly platform at site 2. 2017/04/30. Construction of dome assembly platform at site 2. 2017/04/30. Construction of dome assembly platform at site 2. 2017/04/30. Construction of dome assembly platform at site 2. 2017/05/02. Construction of dome assembly platform at site 2. 2017/05/02. Construction of dome assembly platform at site 2. 2017/05/02. Construction of dome assembly platform at site 2. 2017/05/02. Construction of dome assembly platform at site 2. 2017/05/02. Construction of dome assembly platform at site 2. 2017/05/02. Construction of dome assembly platform at site 2. 2017/05/02. Construction of dome assembly platform at site 2. 2017/05/02. Construction of dome assembly platform at site 2. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1 (bolting stairway stringer to inner column). 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/04. Stairs to observing floor under construction at site 1. 2017/05/05. Stairs to observing floor under construction at site 1. 2017/05/05. Stairs to observing floor under construction at site 1. 2017/05/05. Stairs to observing floor under construction at site 1. 2017/05/05. Stairs to observing floor under construction at site 1. 2017/05/05. Stairs to observing floor under construction at site 1. 2017/05/05. Stairs to observing floor under construction at site 1. 2017/05/05. Stairs to observing floor under construction at site 1. 2017/05/05. Stairs to observing floor under construction at site 1. 2017/05/05. Stairs to observing floor under construction at site 1. 2017/05/05. Installation of top landing on stairway at site 1. 2017/05/05. Installation of top landing on stairway at site 1. 2017/05/05. Installation of top landing on stairway at site 1. 2017/05/05. Installation of top landing on stairway at site 1. 2017/05/05. Installation of top landing on stairway at site 1. 2017/05/05. Installation of top landing on stairway at site 1. 2017/05/05. Installation of top landing on stairway at site 1. 2017/05/05. Installation of top landing on stairway at site 1. 2017/05/05. Stairway to observing floor at site 1 completed.
    TAOS2_LOGO UNAM_LOGO CFA_LOGO NRC_LOGO
    ©2021, TAOS II - Transneptunian Automated Occultation Survey All rights reserved.
    email lock