  • Construction of Telescope Foundations


    2014/10/20. Digging the pit at site 1.
2014/10/20. Digging the pit at site 1. 2014/10/20. Digging the pit at site 1. 2014/10/21. Opening crate to unload concrete embed pieces.
2014/10/21. Part of embed with pier anchor bolts. 2014/10/21. Hanging a plumb bob from step ladder at site 2 to use shadow of sun to mark celestial north. 2014/10/21. Hanging a plumb bob from step ladder at site 2 to use shadow of sun to mark celestial north.
2014/10/21. Starting to install rebar in pit at site 2. 2014/10/21. Part of concrete embed with pier anchor bolts. 2014/10/21. More rebar in pit at site 2. 2014/10/22. More rebar in pit at site 2. 2014/10/22. More rebar in pit at site 2. 2014/10/22. Double checking celestial north with plumb bob. 2014/10/22. Lifting first piece of concrete embed containing pier anchor bolts into place. 2014/10/22. Lifting first piece of concrete embed containing pier anchor bolts into place. 2014/10/22. Lifting first piece of concrete embed containing pier anchor bolts into place. 2014/10/22. Lifting first piece of concrete embed containing pier anchor bolts into place. 2014/10/22. Lifting first piece of concrete embed containing pier anchor bolts into place. 2014/10/22. Lifting first piece of concrete embed containing pier anchor bolts into place. 2014/10/22. Putting concrete embed piece with column anchor bolts into place. 2014/10/22. Putting concrete embed piece with column anchor bolts into place. 2014/10/23. Concrete embed fixture now assembled. 2014/10/23. Leveling concrete embed components to locate anchor bolts correctly. 2014/10/23. Leveling concrete embed components to locate anchor bolts correctly. 2014/10/23. Concrete embed fixture now leveled. 2014/10/31. More rebar on top of concrete embed. 2014/10/23. More rebar on top of concrete embed. 2014/11/23. Video of concrete pour at site 2. 12 truckloads of concrete were needed to fill the pit. 2015/12/01. Foundation at site 1 completed. 2015/12/01. Foundation at site 2 completed. 2015/12/01. Foundation at site 3 completed.