Domes installed at Sites #2 and #3

# Enclosures

schedule 2017-08-09
Matthew Lehner

We installed the domes at Sites #2 and #3 this morning. Everything went very well. This afternoon we got the dome at Site #2 leveled and powered up. We will do the same for the other two domes tomorrow.

Here are the photos from the installation at Site #3.

Crane setting up early this morning.

Crane with spreader bar.

Straps hooked to spreader bar.

Completing the rigging.


Rigging complete. Ready to start lift.

Start of lift.







I'm on my way to the top with the socket set...













Mauricio relaying instructions via radio from the top of the enclosure to the crane operator.



Lift complete!

Here is the view of the lift from the top of the enclosure.







Here are the photos from the installation at Site #2.

Crane ready for setting up.


Trying to swing the boom extension into place. Not much room to maneuver with the trees in the way...

Spreader bar ready with straps.



Rigging up the dome.

Start of the lift.




















Lift complete.

View from the top of the enclosure.


View of Site #2 from Site #1.

View of Site #3 from Site #1.

View of Sites #2 and #3 from Site #1.