We worked to finish as much as we can at Site #2 today. We fixed an unhappy servo motor on the Dec axis (motor encoder was mounted a bit off center), and got the dome home switch working with the TCS software.
We finished the modifications on the camera mounting adapter, and we will try again to take some images tonight.
If all goes well tonight, we will try to move the control electronics form the observing room to the electroncs vault on the ground level tomorrow.